Home Installation What happens on installation day?

What happens on installation day?

Last updated on Oct 08, 2026
  • Our installers usually arrive early in the morning. We will confirm the time with you.
  • They remove your old gas heater from service: the gas supply to the heater is capped and the control parts are removed so it can no longer be used. The whole unit is only removed if needed and practical.
  • A licensed plumber tests for gas leaks. If a leak is found, the gas supply is turned off until it is repaired, either by our plumber (quoted on site) or by your own licensed plumber.
  • You will not have heating while the old heater is disconnected. Heating is back once the new system is fully installed.
  • The installation team confirms the final position of each unit on the day.

The balance is due once the installation is completed.